Project Name:

Water Supply System from Madinat Zayed to Western Liwa Water Pumping Station

Client:

ADWEA

Consultant:

DSS Engineers. Inc.

Main Contractor:

Pan Arabian Enterprises

M & E Contractor:

TAMAS Projects


Scope of Work


Engineering, Procurement, Construction, Installation, Testing and Commissioning of Pump Station to include the following:

  • Piping system of ductile cast iron 200 mm up 900 mm
  • Piping system of ductile cast iron 200 mm up 900 mm
  • Horizontal Split Case Pump: 171 litres /sec capacity x 41m head: 6 Nos.
  • Horizontal Split Case Pump: 240 litres /sec capacity x 72 m head: 4 Nos.
  • Surge Vessels: Capacity: 10 and 35 cu. meters, Bladder Type. :  5 Nos.
  • Chlorination Equipment
  • Two Overhead  electrically operated traveling Cranes , 5 ton capacity

  • Standby Generator
  • Complete Electrical System to include HV/ LV switchgears, MCC, transformers, Power and control cabling, earthing and lightning protection.
  • Instrumentation and Controls
  • Telemetry system
  • Valves and Fittings
  • The internal lighting system including normal light fixtures and height bay fittings.
  • External lighting system includes floodlighting and street lights