Project Name:

Security of the Electric Power Supply and Upgrade of the Network for Presidential Palaces and Hospitals Stage 2 – Lot 1

Client:

ADWEA

Consultant:

Mott Macdonald

Contractor:

WARTSILA-TAMAS JV


Scope of Work


Engineering, Procurement, Construction, Testing and Commissioning of seven (7) Standby Diesel Generating Plants,  Electrical Substations, and Electrical Power Distribution System..

  • Power Plant  & Electrical Substation Buildings, and  all Civil Works
  • Boundary Walls
  • 1500 KVA Diesel Generators – 14 Nos.
  • 11 KV Switchgears
  • LV Switchgears
  • Generator Remote Control Panel
  • Remote Generator Monitoring System
  • Auto Mode Failure ( AMF)
  • Auxiliary Transformers, 500 KVA, 11KV / 0.415KV.
  • 50 VDC Battery System

  • Load Dispatch Centre
  • Local Control Panel
  • HV, LV and Control Cabling
  • Earthing & Lighting Protection
  • Internal & External Lightings
  • Overhead Cranes
  • Fuel Oil System
  • Generator Hall Ventilation and Acoustic System