Project Name:
Water Supply System from Madinat Zayed to Western Liwa Water Pumping Station
Client:
ADWEA
Consultant:
DSS Engineers. Inc.
Main Contractor:
Pan Arabian Enterprises
M & E Contractor:
TAMAS Projects
|

|
|
Scope of Work
Engineering, Procurement, Construction, Installation, Testing and Commissioning of Pump Station to include the following:
- Piping system of ductile cast iron 200 mm up 900 mm
- Piping system of ductile cast iron 200 mm up 900 mm
- Horizontal Split Case Pump: 171 litres /sec capacity x 41m head: 6 Nos.
- Horizontal Split Case Pump: 240 litres /sec capacity x 72 m head: 4 Nos.
- Surge Vessels: Capacity: 10 and 35 cu. meters, Bladder Type. : 5 Nos.
- Chlorination Equipment
- Two Overhead electrically operated traveling Cranes , 5 ton capacity
|

|
- Standby Generator
- Complete Electrical System to include HV/ LV switchgears, MCC, transformers, Power and control cabling, earthing and lightning protection.
- Instrumentation and Controls
- Telemetry system
- Valves and Fittings
- The internal lighting system including normal light fixtures and height bay fittings.
- External lighting system includes floodlighting and street lights
|

|
|
|
|
|
|
|